yeastDemolition work will begin at Zomerloos Entertainment Center during the week of August 8, the first week after the construction holiday.
The swimming pool with changing rooms, cafeteria, ballroom foyer and counter with offices will be demolished. A new community hall, larger foyer, space for tourism, music school and space for the Zomerloos administration will be built on this site. Designed by architect Verly & Vandecasteele of Gistel. Everything is located on the ground floor except for the music school. It is designed on two floors. The entrance area will be provided with a wide canopy to enable a dry connection between the gym and leisure centre. The existing facades of the gymnasium are also being renovated next to the leisure centre.
Because of the demolition work, the city had to search for a new entrance to the event hall, sports hall, and temporary accommodation for staff. The entrance to the event hall is currently located on Zomerloosstraat. The sports hall and the administration can be accessed through the entrance to the Sportkaffee. New entrances are indicated by signs.
All information and plans can be found on the city’s website: https://www.gistel.be/herwaardering-vrijtijdscentrum-zomerloos
Unlimited free access to Showbytes? And that can!
Log in or create an account and never miss any of the stars.
“Coffee buff. Twitter fanatic. Tv practitioner. Social media advocate. Pop culture ninja.”
More Stories
Head coach Willem Jansen gives players space to be vulnerable
PAHO prepares countries in the region for future epidemics with a workshop – Dagblad Suriname
How do you grow food on the saline soil of Mars? Scientists have devised a method